Umm Al Quwain desalination plant

Projects
Project:
Umm Al Quwain desalination plant
Operator:
ACWA Power
Water balance:
1092440 [m³H2O]
Estimated annual value:
25000 [m³H2O]
Technical description:
Physical variable:
Volume
Meters:
1
Parameterization:
Exante Factor:
1 [m³H2O/m³]

The Plant along with the associated intake & outfall facilities shall be developed to produce 150 MIGD (682,000 m³/day) of desalinated water. The project shall be located at a coastal site in the Emirate of Umm Al Quwain along the border of Emirate of Ras Al Khaimah. Disclosure: This is a DEMO project.

Technical information
Methodology:
Balances hídricos N/A
Standard:
No registrado N/A
End of monitoring:
12/31/2044
Start of monitoring:
1/1/2023
Length of credit period (years):
12
MRV Description

Water productions is remotely and continuously measured monitored, and then cross-checked with third parties information.

SDG 6: Clean water and sanitation SDG 11: Sustainable cities and communities SDG 12: Responsible consumption and production SDG 13: Climate action

No mentions have been found on the NDC.

0xDadCc01262Ab1a635Ddfc2a8dBc4416eB685a3C2

m³H2O
22,015
Water balance [m³H2O]
Volume [m³]
22,015
# Medidores
1
Monitored quantity [m³]
Information backed on blockchain
Day Meter Blockchain Calculated
3/26/2025 Umm Al Quwain Meter
04751fcc25b8991cd682d632200dbe97e16104c4e26db7b34f47359ab6ed725a
04751fcc25b8991cd682d632200dbe97e16104c4e26db7b34f47359ab6ed725a
3/25/2025 Umm Al Quwain Meter
a6b1cb6f9c4ba0e35108cd10af0e053d7c7bbd3f7ad7cdf6559acb789f12249f
a6b1cb6f9c4ba0e35108cd10af0e053d7c7bbd3f7ad7cdf6559acb789f12249f
3/24/2025 Umm Al Quwain Meter
bf9823db446ddb74b53f5ac0d22e9f0725432993fabfede547dbc76de63e03b9
bf9823db446ddb74b53f5ac0d22e9f0725432993fabfede547dbc76de63e03b9
3/23/2025 Umm Al Quwain Meter
5892d6c14636153c4ea104a14e3a5bf52d791661f2a3f89c6983aca85be348bf
5892d6c14636153c4ea104a14e3a5bf52d791661f2a3f89c6983aca85be348bf
3/22/2025 Umm Al Quwain Meter
0e311dc999199695043619fff3192ae7c426d6ec5907edb8b861dd0904c2ead1
0e311dc999199695043619fff3192ae7c426d6ec5907edb8b861dd0904c2ead1
3/21/2025 Umm Al Quwain Meter
4304a3448c4a4fa77c9961e6ba3f2a15360b8cf0623a74edd087e699a0459edc
4304a3448c4a4fa77c9961e6ba3f2a15360b8cf0623a74edd087e699a0459edc
3/20/2025 Umm Al Quwain Meter
073866a2a2169c8e412fa325763fcee66b8b3b29988e4eb5af48258d37da45f9
073866a2a2169c8e412fa325763fcee66b8b3b29988e4eb5af48258d37da45f9
Meters
ID Project Name Data source Type Output unit (Material) Frequency monitoring Time zone Actions
ID Project Name Data source Type Output unit Frequency monitoring Time zone Actions
62 Umm Al Quwain desalination plant Umm Al Quwain Meter API Cliente Primario
Volume
1 hora
Periódica
Asia/Dubai
Verifications
Creator Project Token Start End Type Status Emissions reduction Certificate Actions
Creator Project Token Start End Type Status Emissions reduction Certificate Actions
UAQ-WD
ACWA Power
H2O 6/1/2023 6/30/2023 Semi-automática En progreso 95,305.71 m³H2O
UAQ-WD
ACWA Power
H2O 7/1/2023 7/31/2023 Semi-automática Confirmada 100,289.31 m³H2O
UAQ-WD
ACWA Power
H2O 4/1/2024 4/30/2024 Semi-automática En progreso 96,538.13 m³H2O
UAQ-WD
ACWA Power
H2O 5/1/2024 5/31/2024 Semi-automática En progreso 89,079.61 m³H2O
UAQ-WD
ACWA Power
H2O 6/1/2024 6/30/2024 Semi-automática En progreso 89,148.56 m³H2O
UAQ-WD
ACWA Power
H2O 7/1/2024 7/31/2024 Semi-automática En progreso 91,815.82 m³H2O
UAQ-WD
ACWA Power
H2O 8/1/2024 8/31/2024 Semi-automática En progreso 82,711.88 m³H2O
UAQ-WD
ACWA Power
H2O 9/1/2024 9/30/2024 Semi-automática En progreso 85,737.22 m³H2O
UAQ-WD
ACWA Power
H2O 10/1/2024 10/31/2024 Semi-automática En progreso 70,584.12 m³H2O
UAQ-WD
ACWA Power
H2O 11/1/2024 11/30/2024 Semi-automática En progreso 85,995.1 m³H2O
UAQ-WD
ACWA Power
H2O 12/1/2024 12/31/2024 Semi-automática En progreso 91,695.69 m³H2O
UAQ-WD
ACWA Power
H2O 1/1/2025 1/31/2025 Semi-automática En progreso 35,550.47 m³H2O
UAQ-WD
ACWA Power
H2O 2/1/2025 2/28/2025 Semi-automática En progreso 77,988.71 m³H2O
Last 7 hashes of readings backed on the Blockchain
Day Meter Blockchain Calculated
3/26/2025 Umm Al Quwain Meter
04751fcc25b8991cd682d632200dbe97e16104c4e26db7b34f47359ab6ed725a
04751fcc25b8991cd682d632200dbe97e16104c4e26db7b34f47359ab6ed725a
3/25/2025 Umm Al Quwain Meter
a6b1cb6f9c4ba0e35108cd10af0e053d7c7bbd3f7ad7cdf6559acb789f12249f
a6b1cb6f9c4ba0e35108cd10af0e053d7c7bbd3f7ad7cdf6559acb789f12249f
3/24/2025 Umm Al Quwain Meter
bf9823db446ddb74b53f5ac0d22e9f0725432993fabfede547dbc76de63e03b9
bf9823db446ddb74b53f5ac0d22e9f0725432993fabfede547dbc76de63e03b9
3/23/2025 Umm Al Quwain Meter
5892d6c14636153c4ea104a14e3a5bf52d791661f2a3f89c6983aca85be348bf
5892d6c14636153c4ea104a14e3a5bf52d791661f2a3f89c6983aca85be348bf
3/22/2025 Umm Al Quwain Meter
0e311dc999199695043619fff3192ae7c426d6ec5907edb8b861dd0904c2ead1
0e311dc999199695043619fff3192ae7c426d6ec5907edb8b861dd0904c2ead1
3/21/2025 Umm Al Quwain Meter
4304a3448c4a4fa77c9961e6ba3f2a15360b8cf0623a74edd087e699a0459edc
4304a3448c4a4fa77c9961e6ba3f2a15360b8cf0623a74edd087e699a0459edc
3/20/2025 Umm Al Quwain Meter
073866a2a2169c8e412fa325763fcee66b8b3b29988e4eb5af48258d37da45f9
073866a2a2169c8e412fa325763fcee66b8b3b29988e4eb5af48258d37da45f9
Factores Exante
Owner Token Start End Validity Value Unit Status Archives User
Owner Token Start End Validity Value Unit Status Archives User
UAQ-WD H2O 1/1/2023 12/31/2034 Válido 1 m³CO2/m³ Approved
cmosella@energylab.cl
Constants
There are no registered constants.
First you must create a constant to visualize it.
Factores Exante
Owner Token Start End Validity Value Unit Status Archives User
Owner Token Start End Validity Value Unit Status Archives User
UAQ-WD H2O 1/1/2023 12/31/2034 Válido 1 m³CO2/m³ Approved
cmosella@energylab.cl
Constants
There are no registered constants.
First you must create a constant to visualize it.