Mohammed bin Rashid al Maktoum
Project description
The Mohammed bin Rashid Al Maktoum Solar Park is the largest single-site solar park in the world based on the Independent Power Producer (IPP) model. It has a planned production capacity of 5,000 MW by 2030, with investments totalling AED 50 billion. The monitoring process of this assets relies on remote and periodic recording of its renewable energy generation, which is converted into CO2 reductions against the average grid emission factor. Disclosure: This is a DEMO connection.
Technical information
MRV Description
The monitoring process relies on a periodic and remote monitoring of the power generation meters. Then, the data is converted into CO2 reductions based on the grid emission factor. Disclosure: This is a DEMO calculation.
Contribution to Sustainable Development Goals (SDG)
SDG 11: Sustainable cities and communities SDG 12: Responsible consumption and production SDG 13: Climate action
Input to the Nationally Determined Contribution (NDC)
The UAE’s flagship renewables target aims to achieve an electricity generation mix composed of 44% renewables, 38% gas, 12% “clean” coal and 6% nuclear. The UAE’s federal structure affords each of the emirates considerable autonomy in implementing their own renewables targets, incentives and procurement schemes.
Other certifications or inputs
Dubai has had considerable success in running large-scale, competitive auctions to procure solar power, so this monitoring system helps to track its actual results against the NDC and other commitments.
CO2e emission reductions [tCO2e]
There is no data
There is no data to generate the graph.
Monitored electric energy [MWh]
There is no data
There is no data to generate the graph.
Information backed on blockchain
Day | Meter | Blockchain | Calculated | |
---|---|---|---|---|
3/26/2025 | MBR1 Meter |
e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
|
e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
|
|
3/25/2025 | MBR1 Meter |
e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
|
e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
|
|
3/24/2025 | MBR1 Meter |
e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
|
e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
|
|
3/23/2025 | MBR1 Meter |
e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
|
e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
|
|
3/22/2025 | MBR1 Meter |
e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
|
e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
|
|
3/21/2025 | MBR1 Meter |
e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
|
e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
|
|
3/20/2025 | MBR1 Meter |
e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
|
e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
|
Meters
ID | Project | Name | Data source | Type | Output unit (Material) | Frequency monitoring | Time zone | Actions |
---|---|---|---|---|---|---|---|---|
ID | Project | Name | Data source | Type | Output unit | Frequency monitoring | Time zone | Actions |
61 | Mohammed bin Rashid al Maktoum | MBR1 Meter | API Cliente | Primario |
MWh
Energy
|
1 hora
Periódica
|
Asia/Dubai |
Verifications
Creator | Project | Token | Start | End | Type | Status | Emissions reduction | Certificate | Actions |
---|---|---|---|---|---|---|---|---|---|
Creator | Project | Token | Start | End | Type | Status | Emissions reduction | Certificate | Actions |
MBRPV1
ACWA Power
|
CO2e | 6/1/2023 | 6/30/2023 | Semi-automática | En progreso | 4,272.24 tCO2e | |||
MBRPV1
ACWA Power
|
CO2e | 7/1/2023 | 7/31/2023 | Semi-automática | Confirmada | 5,042.16 tCO2e |
Last 7 hashes of readings backed on the Blockchain
Day | Meter | Blockchain | Calculated | |
---|---|---|---|---|
3/26/2025 | MBR1 Meter |
e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
|
e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
|
|
3/25/2025 | MBR1 Meter |
e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
|
e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
|
|
3/24/2025 | MBR1 Meter |
e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
|
e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
|
|
3/23/2025 | MBR1 Meter |
e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
|
e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
|
|
3/22/2025 | MBR1 Meter |
e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
|
e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
|
|
3/21/2025 | MBR1 Meter |
e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
|
e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
|
|
3/20/2025 | MBR1 Meter |
e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
|
e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
|
Factores Exante
There are no registered factors.
First you must create a factor to visualize it.
Constants
There are no registered constants.
First you must create a constant to visualize it.
Factores Exante
Owner | Token | Start | End | Validity | Value | Unit | Status | Archives | User |
---|---|---|---|---|---|---|---|---|---|
Owner | Token | Start | End | Validity | Value | Unit | Status | Archives | User |
MBRPV1 | CO2e | 1/1/2023 | 12/31/2024 | Expirado | 0.4 | tCO2/MWh | Approved |
|