Piloto H2 Verde
Project description
Proyecto piloto para la generación de hidrógeno verde a partir del uso de un mix de energía renovable.
Technical information
Methodology:
Metodología para la captura y utilización de gases de efecto invernadero en materiales plásticos
Standard:
Otro
End of monitoring:
12/31/2023
Start of monitoring:
6/1/2022
Length of credit period (years):
7
MRV Description
Monitoreo de energía eléctrica consumida para determinar huella de carbono del hidrógeno producido.
Contribution to Sustainable Development Goals (SDG)
ODS13
Input to the Nationally Determined Contribution (NDC)
REducción de emisiones de CO2 en la industria por recambio de combustibles fósiles.
tCO2e
0
CO2e emission reductions [tCO2e]
There is no data
There is no data to generate the graph.
Energy [MWh]
0
# Medidores
1
Monitored electric energy [MWh]
There is no data
There is no data to generate the graph.
Information backed on blockchain
Day | Meter | Blockchain | Calculated | |
---|---|---|---|---|
3/26/2025 | Medidor energia eléctrica H2V |
e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
|
e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
|
|
3/25/2025 | Medidor energia eléctrica H2V |
e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
|
e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
|
|
3/24/2025 | Medidor energia eléctrica H2V |
e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
|
e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
|
|
3/23/2025 | Medidor energia eléctrica H2V |
e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
|
e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
|
|
3/22/2025 | Medidor energia eléctrica H2V |
e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
|
e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
|
|
3/21/2025 | Medidor energia eléctrica H2V |
e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
|
e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
|
|
3/20/2025 | Medidor energia eléctrica H2V |
e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
|
e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
|
Meters
ID | Project | Name | Data source | Type | Output unit (Material) | Frequency monitoring | Time zone | Actions |
---|---|---|---|---|---|---|---|---|
ID | Project | Name | Data source | Type | Output unit | Frequency monitoring | Time zone | Actions |
41 | Piloto H2 Verde | Medidor energia eléctrica H2V | Manual | Primario |
MWh
Energy
|
1 hora
Periódica
|
America/Santiago |
Verifications
Creator | Project | Token | Start | End | Type | Status | Emissions reduction | Certificate | Actions |
---|---|---|---|---|---|---|---|---|---|
Creator | Project | Token | Start | End | Type | Status | Emissions reduction | Certificate | Actions |
PH2V
AES Chile
|
CO2e | 6/1/2022 | 6/30/2022 | Semi-automática | En progreso | 546.4 tCO2e |
Last 7 hashes of readings backed on the Blockchain
Day | Meter | Blockchain | Calculated | |
---|---|---|---|---|
3/26/2025 | Medidor energia eléctrica H2V |
e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
|
e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
|
|
3/25/2025 | Medidor energia eléctrica H2V |
e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
|
e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
|
|
3/24/2025 | Medidor energia eléctrica H2V |
e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
|
e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
|
|
3/23/2025 | Medidor energia eléctrica H2V |
e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
|
e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
|
|
3/22/2025 | Medidor energia eléctrica H2V |
e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
|
e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
|
|
3/21/2025 | Medidor energia eléctrica H2V |
e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
|
e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
|
|
3/20/2025 | Medidor energia eléctrica H2V |
e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
|
e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855
|
Factores Exante
Owner | Token | Start | End | Validity | Value | Unit | Status | Archives | User |
---|---|---|---|---|---|---|---|---|---|
Owner | Token | Start | End | Validity | Value | Unit | Status | Archives | User |
PH2V | CO2e | 1/1/2024 | 12/31/2025 | Válido | 0.4 | tCO2/MWh | Approved |
|
cmosella@energylab.cl |
Constants
There are no registered constants.
First you must create a constant to visualize it.
Factores Exante
Owner | Token | Start | End | Validity | Value | Unit | Status | Archives | User |
---|---|---|---|---|---|---|---|---|---|
Owner | Token | Start | End | Validity | Value | Unit | Status | Archives | User |
PH2V | CO2e | 1/1/2024 | 12/31/2025 | Válido | 0.4 | tCO2/MWh | Approved |
|
cmosella@energylab.cl |
PH2V | CO2e | 6/1/2022 | 12/31/2023 | Expirado | 0.4 | tCO2/MWh | Approved |
|
cmosella@energylab.cl |